QC6: Quantitative Test and Certification3
Ext. Barrel Module IFA035 - DAQ Run Number =1558
- DAMAGED FIBER: We have found some damaged fibers. Three fibers (cells A16, B15 and D_6) had a crack inside the fiber. Another fiber (cell A14) had a little crack too into the aspirine tube. And we found a bad fiber (it gave us less signal) in cell D_6(fiber 5). All af them were replaced using spare ones.
TileRow |
Drop Before Repairing |
Drop After Repairing |
|
PMT 41 - Cell A16 - Fiber# 22 |
2 |
34.5% |
<20% |
PMT 22 - Cell A14 - Fiber# 17 |
3 |
24.8% |
<20% |
PMT 43 - Cell B15 - Fiber# 27 |
4 |
28.1% |
<20% |
PMT 43 - Cell B15 - Fiber# 27 |
6 |
29.0% |
<20% |
PMT 38 - Cell D_6 - Fiber# 5 |
8 |
21.4% |
<20% |
PMT 38 - Cell D_6 - Fiber# 5 |
10 |
22.2% |
<20% |
PMT 37 - Cell D_6 - Fiber# 60 |
9 |
28.3% |
<20% |
PMT 37 - Cell D_6 - Fiber# 60 |
11 |
23.1% |
<20% |
-COUPLING REPAIRED: Some profile were extracted and put them again. The drops after this operation are below the 20% threshold. - Drops Recovered.
TileRow |
Drop Before Repairing |
Drop After Repairing |
|
PMT 42 - Cell A16 - Fiber# 29 |
2 |
21.1% |
<20% |
PMT 16 - Cell B12 - Fiber# 11 |
4 |
21.2% |
<20% |
PMT 16 - Cell B12 - Fiber# 11 |
6 |
21.1% |
<20% |
PMT 38 - Cell D_6 - Fiber# 16 |
8 |
21.5% |
<20% |
PMT 38 - Cell D_6 - Fiber# 20 |
8 |
23.7% |
<20% |
PMT 17 - Cell D_5 - Fiber# 34 |
8 |
23.1% |
<20% |
PMT 37 - Cell D_6 - Fiber# 50 |
10 |
20.9% |
<20% |
PMT 17 - Cell D_5 - Fiber# 19 |
10 |
20.7% |
<20% |
PMT 17 - Cell D_5 - Fiber# 55 |
10 |
22.8% |
<20% |
PMT 37 - Cell D_6 - Fiber# 28 |
11 |
100% |
<20% |
PMT 4 - Cell D_4 - Fiber# 10 |
11 |
24.0% |
<20% |
Files: raw_run1550.hbook - hist_run1550.ps - hist_run1558.ps - raw_run1558.hbook - OPTICAL PROBLEMS RUN1550.txt - OPTICAL PROBLEMS RUN1558.txt
Olga Norniella (onorni@ifae.es)
Carmen Iglesias (iglesias@ifae.es)
Ilya Korolkov (korolkov@ifae.es)