| 1. Module Preparation |
| Task |
Description |
Date |
Operators |
Comments |
| 1.0 |
Record Module Number & Site |
17-04-01 |
P |
|
| 1.1 |
Set-up Module |
17-04-01 |
R, P |
|
| 1.2 |
Set-up Work Space and Supplies |
17-04-01 |
R |
|
| 1.3 |
QC0:
Initial Inspection |
17-04-01 |
P |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 1.3a) Residual Glue,
paint, contaminants |
OK |
|
| 1.3b) Spring Pins |
OK |
|
| 1.3c) Plate/Weld Bar Edges |
OK |
|
| 1.3d) Sub module Shims and
Spacing |
OK |
|
| 1.3e) Painted Surfaces |
OK |
|
| 1.3f) Slot Widths |
OK |
|
| 1.3g) Overall dimensions |
OK |
|
| 1.4 |
Clean and paint Module Surfaces |
17-04-01 |
R |
|
| 1.5 |
Close girder holes with aluminium tape |
17-04-01 |
R, P |
|
| 1.6 |
Install Fiber Fixation Rails
+ Pieces for Bundle Fiber Fixation |
17-04-01 |
P |
|
| 1.7 |
Record Aspirin Tube Batch # |
18-04-01 |
P |
D5,5: 2 tiles from IF 020401. D12: 1 tile from
IF020401 the others from IF070201 |
| 1.8 |
Install Aspirin Tubes and washers |
18-04-01 |
P |
|
| 1.9 |
Mark Cell Boundaries and
Label holes with cell numbers |
17-04-01 |
R, P |
| 2. Tile Installation |
| Task |
Description |
Date |
Operators |
Comments |
| 2.1 |
QC1a:
Tile Inspection |
12-04-01 |
P |
|
| Sub Item |
OK |
Not OK
: List problems and repairs |
| 2.1a) Tile Color |
OK |
There are
important diferences between the color of tiles of size 1, 2, 3, 4, 5, 6 and the tiles of
size 7, 8, 9,10, 11 |
| 2.1b) Tile End Surfaces |
OK |
|
| 2.1c) Tile Wrappers |
OK |
|
| 2.2 |
Record Tile Batch and
pack Numbers |
17-04-01 |
R |
|
| Tile Size |
Packs
ID |
Comments |
| 1 |
545(18), 546, 413, 1086, 544,
512, 412, 1095(2) |
Packs ordered from End Plate to
ITC. The numbers between brackets are the number of tiles extracted from the pack written
just before. If there is not a bracked number after the pack number it means that 20 tiles
were extracted from that pack. |
| 2 |
1375, 562, 729, 761, 808, 572, 585 |
|
| 3 |
890(15), 885, 895, 668, 897, 889,
898, 1021(5) |
|
| 4 |
331, 333,
329, 332, 220, 336, 309 |
4 tiles from pack 333 were
discarded because of the different color; they were replaced by tiles from pack369 |
| 5 |
421, 386, 242, 391, 240, 323, 333 |
|
| 6 |
512, 283, 292, 143, 139, 144, 141 |
|
| 7 |
566, 133, 600, 570, 551, 567, 571,
243(5) |
|
| 8 |
321(16), 296, 530, 528, 506, 594,
630, 597(8) |
|
| 9 |
501(15), 563, 564, 561, 599, 560,
187, 172(10) |
|
| 10 |
319(4), 320, 380, 377, 310, 17,
14, 13, 556(12) |
|
| 11 |
97, 98, 105, 85, 14, 39, 53(14) |
|
| 2.4 |
Insert Tiles |
|
|
|
| 2.5 |
QC1b:
Tile Inspection after insertion |
17-04-01 |
P |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 2.5a) Tile Sizes |
OK |
|
| 2.5b) Tile End Surfaces |
OK |
|
| 2.5c) Tile Wrappers |
OK |
1 |
| 2.6 |
Put Shims where it was needed |
|
|
|
| 2.7 |
Install and close rods |
|
|
|
| 5. Fiber Routing |
| Task |
Description |
Date |
Operators |
Comments |
| 5.1 |
Count fibers inside |
|
|
|
| 5.2 |
Route Sub-bundles To Aspirin Tubes |
14-4-01/20-4-01 |
P, R |
|
| 5.3 |
Remove fibre separator strings |
20-4-01 |
|
|
| 5.4 |
Remove one rod from each tile size |
|
|
|
| 5.5 |
Introduce the LED/light tubes |
20-4-01 |
P |
|
| 5.6 |
QC3:
Verify Fiber Routing |
20-4-01 |
P, L |
|
| Sub Item |
OK |
Not OK
: List problems and repairs |
| 5.6a) Routing mistakes |
OK |
|
| 5.6b) Bad tile/fibre coupling |
OK |
|
| 5.6c) Profiles coming out of
the grooves |
OK |
|
| 5.7 |
Register and secure Fibers in aspirine
tubes |
|
|
|
| 5.8 |
QC4:
Fiber Registraton and Damage |
20-4-01 |
P,L |
|
| Item |
OK |
Not OK
: List problems and repairs |
| 5.8a) Stress Crazing |
OK |
|
| 5.8b) Cladding Damage |
OK |
|
| 5.8c) Fiber Curvature |
OK |
|
| 5.8d) Fibers outside girder |
OK |
|
| 5.9 |
Secure the sub-bundles with velcro straps
and adjust ends |
19-4-01 |
P, R |
|
| 5.10 |
Insert the dummy fibres |
19-4-01 |
P, R |
|
9. Install Source Tubes
(This task will be done at CERN for all modules.) |
| Task |
Description |
Date |
Operators |
Comments |
| 9.1 |
QC7a:
Check Source tube holes |
. |
. |
. |
| 9.2 |
Measure module length |
. |
. |
. |
| 9.3 |
Cut straight tubes |
. |
. |
. |
| 9.4 |
Prepare tube ends |
. |
. |
. |
| 9.5 |
Clean tubes |
. |
. |
. |
| 9.6 |
QC7b:Test with Dummy capsule |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and
repairs |
| Straight Tubes |
. |
. |
| Bent Tubes |
. |
. |
| 9.7 |
Glue pairs of straight tubes to make 'U's |
. |
. |
. |
| 9.8 |
Passing test of 'U' s with dummy capsule |
. |
. |
. |
| 9.9 |
Insert 'U's |
. |
. |
. |
| 9.10 |
Glue the rest of bent tubes |
. |
. |
. |
| 9.11 |
Intermediate passing test of glued parts of
pipe system |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 9.12 |
QC7a: Final passing test of pipe system with dummy capsule |
. |
. |
. |
| 9.13 |
QC7b: Final pressure test |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and repairs |
2 Fibers were replaced (1 D6 short and 1 D6 long) after the final test because they
were damaged during the operation "tape profiles".