| 1. Module Preparation |
| Task |
Description |
Date |
Operators |
Comments |
| 1.0 |
Record Module Number & Site |
1-9-00 |
V |
|
| 1.1 |
Set-up Module |
1-9-00 |
V |
|
| 1.2 |
Set-up Work Space and Supplies |
1-9-00 |
V |
|
| 1.3 |
QC0:
Initial Inspection |
1-9-00 |
V |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 1.3a) Residual Glue,
paint, contaminants |
OK |
|
| 1.3b) Spring Pins |
OK |
|
| 1.3c) Plate/Weld Bar Edges |
OK |
|
| 1.3d) Sub module Shims and
Spacing |
OK |
|
| 1.3e) Painted Surfaces |
OK |
|
| 1.3f) Slot Widths |
OK |
|
| 1.3g) Overall dimensions |
OK |
|
| 1.4 |
Clean and paint Module Surfaces |
31-8-00 |
R, V |
|
| 1.5 |
Close girder holes with aluminium tape |
31-8-00 |
R |
|
| 1.6 |
Install Fiber Fixation Rails
+ Pieces for Bundle Fiber Fixation |
1-9-00 |
R |
|
| 1.7 |
Record Aspirin Tube Batch # |
1-9-00 |
V |
IFA310100 |
| 1.8 |
Install Aspirin Tubes and washers |
1-9-00 |
V |
|
| 1.9 |
Mark Cell Boundaries and
Label holes with cell numbers |
1-9-00 |
R, V, P |
| 2. Tile Installation |
| Task |
Description |
Date |
Operators |
Comments |
| 2.1 |
QC1a:
Tile Inspection |
1-9-00 |
V |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 2.1a) Tile Color |
OK |
There are important diferences
between the color of tiles of size 1, 2, 3, 4, 5, 6 and the tiles of size 7, 8, 9,10, 11 |
| 2.1b) Tile End Surfaces |
OK |
|
| 2.1c) Tile Wrappers |
OK |
|
| 2.2 |
Record Tile Batch and pack Numbers |
1-9-00 |
R, V |
|
| Tile Size |
Packs ID |
Comments |
| 1 |
1028, 1024, 1026, 16, 1032, 1011,
970(19), 1027(1) |
Packs ordered from End Plate to
ITC. The numbers between brackets are the number of tiles extracted from the pack written
just before. If there is not a bracked number after the pack number it means that 20 tiles
were extracted from that pack. |
| 2 |
688, 675, 672, 694, 740, 826, 628 |
|
| 3 |
140, 138, 102, 81, 68, 1392, 1371 |
|
| 4 |
135, 216, 182, 185, 368, 97,
144(19), 500 (1) |
|
| 5 |
429, 523, 453, 455, 462, 303, 297 |
|
| 6 |
51, 21, 18, 31, 20, 22, 116 |
|
| 7 |
83 (9), 105, 136, 36, 56, 153, 41,
100 (16); 1 special tile IF221099 |
|
| 8 |
243(12), 279, 259, 280, 185, 275,
188, 220(12); 1 special tile IF221099 |
|
| 9 |
548(10), 546, 375, 585, 300, 304,
522, 297(15); 1 special tile IF221099 |
|
| 10 |
246(8), 254, 136, 90, 139, 88, 72,
65, 166 (8); 1 special tile IF221099 |
|
| 11 |
403 (6), 448, 575, 96, 99, 89, 97,
93, 91(11) |
|
| 2.4 |
Insert Tiles |
1-9-00 |
R, V |
|
| 2.5 |
QC1b:
Tile Inspection after insertion |
1-9-00 |
V, R |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 2.5a) Tile Sizes |
OK |
|
| 2.5b) Tile End Surfaces |
OK |
|
| 2.5c) Tile Wrappers |
OK |
|
| 2.6 |
Put Shims where it was needed |
29-8-00 |
R, V |
|
| 2.7 |
Install and close rods |
15-9-00 |
R, V |
| 5. Fiber Routing |
| Task |
Description |
Date |
Operators |
Comments |
| 5.1 |
Count fibers inside |
5-9-00 |
R, V |
|
| 5.2 |
Route Sub-bundles To Aspirin Tubes |
5-9-00 |
P |
|
| 5.3 |
Remove fibre separator strings |
6-9-00 |
R, V |
|
| 5.4 |
Remove one rod from each tile size |
|
|
The rods where not yet installed at this
point. |
| 5.5 |
Introduce the LED/light tubes |
5-9-00 |
P |
|
| 5.6 |
QC3:
Verify Fiber Routing |
5-9-00 |
P |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 5.6a) Routing mistakes |
OK |
|
| 5.6b) Bad tile/fibre coupling |
OK |
|
| 5.6c) Profiles coming out of
the grooves |
OK |
|
| 5.7 |
Register and secure Fibers in aspirine
tubes |
5-9-00 |
R, V |
|
| 5.8 |
QC4:
Fiber Registraton and Damage |
5-9-00 |
P |
|
| Item |
OK |
Not OK : List problems and
repairs |
| 5.8a) Stress Crazing |
OK |
|
| 5.8b) Cladding Damage |
OK |
|
| 5.8c) Fiber Curvature |
OK |
|
| 5.8d) Fibers outside girder |
OK |
|
| 5.9 |
Secure the sub-bundles with velcro straps
and adjust ends |
5-9-00 |
R, V |
|
| 5.10 |
Insert the dummy fibres |
5-9-00 |
P |
|
9. Install Source Tubes
(This task will be done at CERN for all modules.) |
| Task |
Description |
Date |
Operators |
Comments |
| 9.1 |
QC7a:
Check Source tube holes |
. |
. |
. |
| 9.2 |
Measure module length |
. |
. |
. |
| 9.3 |
Cut straight tubes |
. |
. |
. |
| 9.4 |
Prepare tube ends |
. |
. |
. |
| 9.5 |
Clean tubes |
. |
. |
. |
| 9.6 |
QC7b:Test with Dummy capsule |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and
repairs |
| Straight Tubes |
. |
. |
| Bent Tubes |
. |
. |
| 9.7 |
Glue pairs of straight tubes to make 'U's |
. |
. |
. |
| 9.8 |
Passing test of 'U' s with dummy capsule |
. |
. |
. |
| 9.9 |
Insert 'U's |
. |
. |
. |
| 9.10 |
Glue the rest of bent tubes |
. |
. |
. |
| 9.11 |
Intermediate passing test of glued parts of
pipe system |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 9.12 |
QC7a: Final passing test of pipe system with dummy capsule |
. |
. |
. |
| 9.13 |
QC7b: Final pressure test |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and repairs |