| 1. Module Preparation |
| Task |
Description |
Date |
Operators |
Comments |
| 1.0 |
Record Module Number & Site |
2-5-00 |
P |
|
| 1.1 |
Set-up Module |
2-5-00 |
P |
|
| 1.2 |
Set-up Work Space and Supplies |
2-5-00 |
P |
|
| 1.3 |
QC0:
Initial Inspection |
2-5-00 |
P |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 1.3a) Residual Glue,
paint, contaminants |
OK |
|
| 1.3b) Spring Pins |
OK |
|
| 1.3c) Plate/Weld Bar Edges |
OK |
|
| 1.3d) Sub module Shims and
Spacing |
OK |
|
| 1.3e) Painted Surfaces |
OK |
|
| 1.3f) Slot Widths |
OK |
|
| 1.3g) Overall dimensions |
OK |
|
| 1.4 |
Clean and paint Module Surfaces |
28-4-00 |
P |
|
| 1.5 |
Close girder holes with aluminium tape |
28-4-00 |
R |
|
| 1.6 |
Install Fiber Fixation Rails
+ Pieces for Bundle Fiber Fixation |
28-4-00 |
R |
|
| 1.7 |
Record Aspirin Tube Batch # |
2-5-00 |
P |
All from IF310100 except 2 units of D5.5 that
were extracted from IF280300 |
| 1.8 |
Install Aspirin Tubes and washers |
2-5-00 |
R |
|
| 1.9 |
Mark Cell Boundaries and
Label holes with cell numbers |
28-4-00 |
R,P |
| 2. Tile Installation |
| Task |
Description |
Date |
Operators |
Comments |
| 2.1 |
QC1a:
Tile Inspection |
2-5-00 |
P, R |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 2.1a) Tile Color |
OK |
|
| 2.1b) Tile End Surfaces |
OK |
|
| 2.1c) Tile Wrappers |
OK |
|
| 2.2 |
Record Tile Batch and pack Numbers |
2-5-00 |
P, R |
|
| Tile Size |
Packs ID |
Comments |
| 1 |
B5: 79; B22: 362; B17: 274; B22:
369, 370; B5: 87, 86 |
Packs ordered from End Plate to
ITC. The number after B means the box number and the numbers between brackets are the
number of tiles extracted from the pack written just before. If there is not a bracked
number after the pack number it means that 20 tiles were extracted from that pack. |
| 2 |
B18: 282; B13: 251; B4: 24; B11:
159, 174, 173, 156 |
|
| 3 |
B2: 41(19), 32; B3: 48, 52; B14:
251; B3: 46; B2: 221, 222(1) |
|
| 4 |
B19: 203, 206; B3: 19; B19: 201;
B8: 79, 76; B29: 321 |
|
| 5 |
B1: 17; B25: 294; B17:256; B1: 16;
B24: 260, 267; B1: 13 |
|
| 6 |
B1: 21; B4: 60; B37: 441; B4: 54;
B1: 41, 49; B4: 62 |
|
| 7 |
B3: 10(15); B43: 374; B3: 7; B43:
370; B3: 14; B35: 308, 309; B45: 388(10); 1 special tile IF221099 |
|
| 8 |
B1: 7(15); B30: 269; B32: 291;
B20: 200; B15: 122, 130; B30: 268; B15: 116 (9); 1 special tile IF221099 |
|
| 9 |
B4: 33(15); B20: 174; B4: 31; B1:
7, 5; B6: 53; B1: 9; B3: 23(10); 1 special tile IF221099 |
|
| 10 |
B27: 159 (19); B20: 114; B37: 215;
B4: 24; B7: 37, 38; B20: 124; B4 19(17); 1 special tile IF221099 |
|
| 11 |
B2: 22(3); B4:34, 26; B8: 83; B1:
2; B8: 84, 82; B6: 64; B1: 3(14) |
|
| 2.4 |
Insert Tiles |
2-5-00 |
R,P |
|
| 2.5 |
QC1b:
Tile Inspection after insertion |
2-5-00 |
P |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 2.5a) Tile Sizes |
OK |
|
| 2.5b) Tile End Surfaces |
OK |
|
| 2.5c) Tile Wrappers |
OK |
|
| 2.6 |
Put Shims where it was needed |
25-4-00 |
P, R |
|
| 2.7 |
Install and close rods |
16-5-00 |
R |
| 5. Fiber Routing |
| Task |
Description |
Date |
Operators |
Comments |
| 5.1 |
Count fibers inside |
4-5-00 |
P, R |
|
| 5.2 |
Route Sub-bundles To Aspirin Tubes |
4-5-00 |
P |
|
| 5.3 |
Remove fibre separator strings |
8-5-00 |
P |
|
| 5.4 |
Remove one rod from each tile size |
|
|
The rods where not yet installed at this
point. |
| 5.5 |
Introduce the LED/light tubes |
4-5-00 |
P |
|
| 5.6 |
QC3:
Verify Fiber Routing |
4-5-00 |
P, L |
|
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 5.6a) Routing mistakes |
OK |
|
| 5.6b) Bad tile/fibre coupling |
OK |
|
| 5.6c) Profiles coming out of
the grooves |
OK |
|
| 5.7 |
Register and secure Fibers in aspirine
tubes |
4-5-00 |
P, R |
|
| 5.8 |
QC4:
Fiber Registraton and Damage |
4-5-00 |
P,L |
|
| Item |
OK |
Not OK : List problems and
repairs |
| 5.8a) Stress Crazing |
OK |
|
| 5.8b) Cladding Damage |
OK |
|
| 5.8c) Fiber Curvature |
OK |
|
| 5.8d) Fibers outside girder |
OK |
|
| 5.9 |
Secure the sub-bundles with velcro straps
and adjust ends |
4-5-00 |
P, R |
|
| 5.10 |
Insert the dummy fibres |
4-5-00 |
P, R |
|
9. Install Source Tubes
(This task will be done at CERN for all modules.) |
| Task |
Description |
Date |
Operators |
Comments |
| 9.1 |
QC7a:
Check Source tube holes |
. |
. |
. |
| 9.2 |
Measure module length |
. |
. |
. |
| 9.3 |
Cut straight tubes |
. |
. |
. |
| 9.4 |
Prepare tube ends |
. |
. |
. |
| 9.5 |
Clean tubes |
. |
. |
. |
| 9.6 |
QC7b:Test with Dummy capsule |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and
repairs |
| Straight Tubes |
. |
. |
| Bent Tubes |
. |
. |
| 9.7 |
Glue pairs of straight tubes to make 'U's |
. |
. |
. |
| 9.8 |
Passing test of 'U' s with dummy capsule |
. |
. |
. |
| 9.9 |
Insert 'U's |
. |
. |
. |
| 9.10 |
Glue the rest of bent tubes |
. |
. |
. |
| 9.11 |
Intermediate passing test of glued parts of
pipe system |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and
repairs |
| 9.12 |
QC7a: Final passing test of pipe system with dummy capsule |
. |
. |
. |
| 9.13 |
QC7b: Final pressure test |
. |
. |
. |
| Sub Item |
OK |
Not OK : List problems and repairs |
| 12. Test & Certification (QC6) |
| Task |
Description |
Date |
Operators |
Comments |
| 12.1 |
Insert Test Drawer |
5/10/00 |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.2 |
Install Source & Driver |
-. |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.3 |
Connect Power and
Signal Cables |
- |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.4 |
Record Source Scan
for Each Tile Layer |
- |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.5 |
Verify that the Data is Good |
- |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.6 |
Remove &
Store Source & Driver |
- |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.7 |
Remove &
Store Test Drawer |
5/11/00 |
M.Cavalli-Sforza
O.Norniella |
. |
| 12.8 |
Update Production
Monitor Pages |
5/12/00 |
J. Flix
O. Norniella |
. |