| IFA002 Extended Barrel | TILECAL OPTICS INSTRUMENTATION CHECK LIST | Cover Sheet |
| REF | ||
| REV:1 date 3 - 12 - 99 |
| TASK | DESCRIPTION | QC Page |
| 1 | QC0 | |
| 2 | QC1 | |
| 3 | ||
| 4 | QC2 | |
| 5 | QC3 | |
| 6 | QC4 | |
| 7 | ||
| 8 | QC5 | |
| 9 | QC7 | |
| 10 | ||
| 11 | ||
| 12 | QC6 |
GENERAL REMARKS |
Instrumentation start date: 10/20/99
For detailed QC6 Info for module IFA002: Click Here. |
| TILECAL OPTICS INSTRUMENTATION CHECK LIST | Sheet 1 of 12 | |
| INSTITUTION:IFAE | MODULE N0:IFA002 |
| 1. Module Preparation | ||||
| Task | Description | Date | Operators | Comments |
| 1.0 | Record Module Number & Site | 20-10-99 | F,S. | . |
| 1.1 | Set-up Module | 20-10-99 | P | |
| 1.2 | Set-up Work Space and Supplies | 20-10-99 | F,S | |
| 1.3 | QC0: Initial Inspection |
20-10-99. | F, S | |
| Sub Item | OK | Not OK : List problems and repairs | ||
| 1.3a) Residual Glue, paint, contaminants | OK | |||
| 1.3b) Spring Pins | OK | |||
| 1.3c) Plate/Weld Bar Edges | OK | |||
| 1.3d) Sub module Shims and Spacing | OK | |||
| 1.3e) Painted Surfaces | OK | |||
| 1.3f) Slot Widths | OK | |||
| 1.3g) Overall dimensions | OK | |||
| 1.4 | Clean and paint Module Surfaces | 20-10-99 | F, S | |
| 1.5 | Close girder holes with aluminium tape | 20-10-99 | F | |
| 1.6 | Install Fiber Fixation Rails + Pieces for Bundle Fiber Fixation |
20-10-99 | P | |
| 1.7 | Record Aspirin Tube Batch # | 22-10-99 | P | IF100999 |
| 1.8 | Install Aspirin Tubes and washers | 20-10-99 | F, P | |
| 1.9 | Mark Cell Boundaries and Label holes with cell numbers |
20-10-99 | P | |
| 2. Tile Installation | |||||
| Task | Description | Date | Operators | Comments | |
| 2.1 | QC1a: Tile Inspection |
20-10-99 | P | ||
| Sub Item | OK | Not OK : List problems and repairs | |||
| 2.1a) Tile Color | OK | ||||
| 2.1b) Tile End Surfaces | OK | ||||
| 2.1c) Tile Wrappers | OK | Wrapers of scintillators 11 box 84 too much big. They have been installed with difficulty | |||
| 2.2 | Record Tile Batch and pack Numbers | 20-10-99 | P | ||
| Tile Size | Packs ID | Comments | |||
| 1 | 16 | ||||
| 2 | 20 | ||||
| 3 | 13 | ||||
| 4 | 10 | ||||
| 5 | 8 | ||||
| 6 | 7 | ||||
| 7 | 13 | ||||
| 8 | 55 | ||||
| 9 | 52 | ||||
| 10 | 84 and 79 | 120 tiles from box 84 and 36 tiles from box 79 | |||
| 11 | 84 and 79 | 120 tiles from box 84 and 38 tiles from box 79 | |||
| 2.4 | Insert Tiles | 25-10-99 | P, F | ||
| 2.5 | QC1b: Tile Inspection after insertion |
26-10-99 | P | ||
| Sub Item | OK | Not OK : List problems and repairs | |||
| 2.5a) Tile Sizes | OK | ||||
| 2.5b) Tile End Surfaces | OK | ||||
| 2.5c) Tile Wrappers | OK | ||||
| 2.6 | Put Shims where it was needed | 26-10-99 | P | ||
| 2.7 | Install and close rods | 12-11-99 | P, F | ||
| 3. Routing Preparations | ||||
| Task | Description | Date | Operators | Comments |
| 3.1 | Record ITC Fiber serial # (EB only) |
27-10-99 | P | IF151099/RIGHT8 IF151099/LEFT8 |
| 3.2 | Install ITC Fiber Assemblies (EB's Only) |
27-10-99 | P | |
| 3.3 | Record Laser Fiber Bundle IDs | 27-10-99 | P | IF151099 (52318-7507) |
| 3.4 | Install Laser Fiber Bundles | 27-10-99 | P | |
| 3.5 | Install Fiber Separator wires | 29-10-99 | F, S | |
| 4. Fiber/Profile Installation | ||||
| Task | Description | Date | Operators | Comments |
| 4.1 | Record profiles/fibers Batch #s | 28-10-99 | F | IF150999 |
| 4.2 | Fill table with profile boxes | 28-10-99 | F, P | |
| 4.3 | Insert Profiles/fibers and make sub bundles | 28-10-99 | F, P | |
| 4.4 | QC2: Verify Fiber Lengths and Sorting using LED tubes |
1-11-99 | F, P | |
| Sub Item | OK | Not OK : List problems and repairs | ||
| 4.4a) Fiber Lengths | OK | Some fibers were cut. | ||
| 4.4b) Fiber Counts | OK | |||
| 4.4c) Depth Sorting | OK | |||
| 4.4d) Bad tile/fiber coupling or bad fibers | OK | |||
| 4.5 | Tape Profiles | Installed after QC6 | ||
| 5. Fiber Routing | ||||
| Task | Description | Date | Operators | Comments |
| 5.1 | Count fibers inside | 4-11-99 | P, F | |
| 5.2 | Route Sub-bundles To Aspirin Tubes | 4-11-99 5-11-99 |
P,F | |
| 5.3 | Remove fibre separator strings | 30-11-99 | F | |
| 5.4 | Remove one rod from each tile size | The rods to introduce light tubes where not yet installed at this point. | ||
| 5.5 | Introduce the LED/light tubes | 5-11-99 | P | |
| 5.6 | QC3: Verify Fiber Routing |
8-11-99 | P | |
| Sub Item | OK | Not OK : List problems and repairs | ||
| 5.6a) Routing mistakes | OK | |||
| 5.6b) Bad tile/fibre coupling | OK | |||
| 5.6c) Profiles coming out of the grooves | OK | |||
| 5.7 | Register and secure Fibers in aspirine tubes | 9-11-99 | P, F | |
| 5.8 | QC4: Fiber Registraton and Damage |
9-11-99 | P, F | |
| Item | OK | Not OK : List problems and repairs | ||
| 5.8a) Stress Crazing | OK | |||
| 5.8b) Cladding Damage | OK | |||
| 5.8c) Fiber Curvature | OK | Some fibers are not long enough and have too much curvature (Bundle of cell B13 odd side) | ||
| 5.8d) Fibers outside girder | OK | |||
| 5.9 | Secure the sub-bundles with velcro straps and adjust ends | 9-11-99 | P, F | |
| 5.10 | Insert the dummy fibres | 9-11-99 | P, F | |
| 6. Glue fiber bundles | ||||
| Task | Description | Date | Operators | Comments |
| 6.1 | Prepare glue | 9-11-99 | P | BATCH #382170702 BATCH #391338802 |
| 6.2 | Verify again fibre extremities | 9-11-99 | P, F | |
| 6.3 | Glue | 9-11-99 | P, F | |
| 6.4 | Reserve Samples of Epoxy | 9-11-99 | P | |
| 6.5 | Wait for Epoxy Cure | 9-11-99 | P | |
| 7. Secure fiber bundles | ||||
| Task | Description | Date | Operators | Comments |
| 7.1 | Cut dummy fibers extremities | 1-12-99 | P | |
| 7.2 | Tie Fiber Bundles to Rails | 1-12-99 | P | |
| 7.3 | Put cotton cable | 1-12-99 | P | |
| 8. Polish Fiber Ends | ||||
| Task | Description | Date | Operators | Comments |
| 8.1 | Set-up the Polishing Machine | 11-11-99 | LL,P | |
| 8.2 | Polish Fibers | 11-11-99 | LL,P | |
| 8.4 | Remove Polishing Machine | 12-11-99 | P | |
| 8.3 | Clean the girder | 12-11-99 | P, R, F | |
| 8.5 | QC5: Inspect Fiber Ends | 12-11-99 | LL | |
| Sub Item | OK | Not OK : List problems and repairs | ||
| 8.5a) Check for dust inside the girder | OK | |||
| 8.5b) Fiber End Surface Quality | OK. | D4 EVEN. 2 fibers not arriving atthe end. Laser
fiber not arriving at the end. This cell has been completely reconstructed B13 EVEN.6 fibers missing, routed to B12. fibers cut from the B12. B13 completely reconstructed. D5 EVEN.2 fibers not arriving at the end. Splicing of 2 fibers A16 EVEN . 1 fiber not arriving at the end. Splicing of 1 fiber. D6 ODD. 1 fiber not arriving at the end. Splicing of 1 fiber. D5 ODD. 1 fiber not arriving at the end. Splicing of 1 fiber. |
||
| 8.5c) Visual Light Level with video camera | OK | |||
| 9. Install Source Tubes (This task will be done at CERN for all modules.) |
||||
| Task | Description | Date | Operators | Comments |
| 9.1 | QC7a: Check Source tube holes |
. | . | . |
| 9.2 | Measure module length | . | . | . |
| 9.3 | Cut straight tubes | . | . | . |
| 9.4 | Prepare tube ends | . | . | . |
| 9.5 | Clean tubes | . | . | . |
| 9.6 | QC7b:Test with Dummy capsule | . | . | . |
| Sub Item | OK | Not OK : List problems and repairs | ||
| Straight Tubes | . | . | ||
| Bent Tubes | . | . | ||
| 9.7 | Glue pairs of straight tubes to make 'U's | . | . | . |
| 9.8 | Passing test of 'U' s with dummy capsule | . | . | . |
| 9.9 | Insert 'U's | . | . | . |
| 9.10 | Glue the rest of bent tubes | . | . | . |
| 9.11 | Intermediate passing test of glued parts of pipe system | . | . | . |
| Sub Item | OK | Not OK : List problems and repairs | ||
| 9.12 | QC7a: Final passing test of pipe system with dummy capsule | . | . | . |
| 9.13 | QC7b: Final pressure test | . | . | . |
| Sub Item | OK | Not OK : List problems and repairs | ||
| 10. Close up | ||||
| Task | Description | Date | Operators | Comments |
| 10.1 | Remove Temporary Labels | Not temporary labels installed | ||
| 10.2 | Cover Module with Light Tight 'Paper' | 1-12-99 | ||
| 10.3 | Attach Girder End Plates | |||
General remarks/comments on item 10:
| 11. Cleanup | ||||
| Task | Description | Date | Operators | Comments |
| 11.1 | Remove Assembly Fixture | . | . | . |
| 11.2 | Remove Supplies and Tools | . | . | . |
| 12. Test & Certification (QC6) | ||||
| Task | Description | Date | Operators | Comments |
| 12.1 | Insert Test Drawer | 11/16/99 | I. Korolkov J. Flix |
. |
| 12.2 | Install Source & Driver | . | I. Korolkov J. Flix |
. |
| 12.3 | Connect Power and Signal Cables |
. | I. Korolkov J. Flix |
. |
| 12.4 | Record Source Scan for Each Tile Layer |
. | I. Korolkov J. Flix |
. |
| 12.5 | Verify that the Data is Good | . | I. Korolkov J. Flix |
. |
| 12.6 | Remove & Store Source & Driver |
. | I. Korolkov J. Flix |
. |
| 12.7 | Remove & Store Test Drawer |
11/29/99 | I. Korolkov J. Flix |
. |
| 12.8 | Update Production Monitor Pages |
. | J. Flix | . |
Page maintained by:
Juan Carlos Peņa Garcia jcpg@ifae.es
QC6 part maintained by:
Josep Flix jflix@ifae.es